- Author: Colin Hensley
- Tags: Home mining, #start-here

Choose an ASIC miner PDU by matching the site's electrical supply to the exact PDU input, then checking every miner power supply, cord, outlet and load bank against its permitted load. Outlet count and a headline wattage aren't enough. I'd buy only after an electrician or the facility's authorized electrical staff has approved the model and a written outlet-by-outlet load schedule. Add remote monitoring or switching when it solves a specific operating need.

## Get the supply and miner requirements before shopping

A power distribution unit distributes power to connected equipment. Begin with the supply information your installer confirms: voltage, frequency, phase arrangement, available conductors and grounding, upstream protection, connection type and permitted continuous load. Have the installer identify the exact receptacle or hardwired connection. Don't open a panel or probe live terminals to fill in a buying checklist.

Next, record each miner's exact model, PSU variant, permitted AC input, required power connections and intended operating profile. Use the current manufacturer instructions, including any requirement to power multiple inputs together. A miner's DC board voltage doesn't identify the AC supply it needs, and similar-looking power supplies aren't automatically interchangeable.

Match the PDU's specified output voltage to the PSU's input range. For three-phase equipment, have the installer confirm the actual output voltage, conductor requirements and which outlets belong to each phase or phase pair. [Eaton's managed-PDU range includes different single- and three-phase configurations](https://www.eaton.com/us/en-us/catalog/backup-power-ups-surge-it-power-distribution/eaton-managed-rack-pdu.html?ref=cnainbridge.org); a family name or a voltage in a listing title doesn't identify the wiring or outlet arrangement of the unit you're buying.

The approved schedule must keep each phase or phase pair within its own limits. Don't assume that a three-phase PDU automatically moves loads between phases or makes an uneven allocation acceptable. Have the installer assign the outlets and verify the resulting loads.

A plug adapter can't establish this compatibility. If the supply, required conductors or protection don't match, stop the purchase and have the installation designed around approved equipment. Don't cut off a plug, improvise a neutral or use a splitter to make an incompatible power path fit.

## Check the inlet, every bank and every outlet

Read the exact SKU's specification and installation manual together. A bank is a group of outlets sharing a limit or protective device; the total PDU rating doesn't give every bank or socket that capacity. Include every connected load in the schedule, including equipment sharing the upstream circuit.

[Eaton's PDUMH30HV specification gives a useful example of these separate limits](https://assets.tripplite.com/product-pdfs/en/pdumh30hv.pdf?ref=cnainbridge.org). It describes a single-phase unit with a NEMA L6-30P input, nominal 208/230 V output and two separately metered outlet banks. The figures below belong to this model; they aren't generic ratings for all C13/C19 PDUs or a recommendation for a particular miner.

| Part of this PDU | Published specification                                       | What to check in your allocation                                                                                              |
| ---------------- | ------------------------------------------------------------- | ----------------------------------------------------------------------------------------------------------------------------- |
| Input            | 30 A service; agency-derated maximum input of 24 A continuous | The sum of the loads must fit the continuous input allowance and the approved upstream supply.                                |
| Outlet banks     | Two banks of nine outlets, each protected by a 20 A breaker   | Check each bank separately. The breaker rating alone doesn't establish its permitted continuous loading in your installation. |
| C13 outlets      | 16 outlets; 12 A maximum per outlet                           | Check the individual load, complete cord assembly and connected PSU.                                                          |
| C19 outlets      | Two outlets; 16 A maximum per outlet                          | A larger socket still shares its bank and the PDU input budget.                                                               |

Focus the table and scroll sideways to compare the published ratings with the allocation checks.

For a hypothetical allocation, two 12 A loads placed on the same bank total 24 A. Each could fit this model's published C13 outlet maximum, yet together they exceed that bank's 20 A maximum. Moving one load doesn't by itself approve the arrangement: the installer must still check continuous bank allowances, the total input, cords, startup conditions and the connected equipment's requirements.

![PDUMH30HV limits: 24 A continuous input, separate 20 A bank breakers, 12 A C13 and 16 A C19 outlet maxima](https://storage.ghost.io/c/a1/4d/a14da2a0-3ee7-4807-afb1-3b1f503a3916/content/images/2026/11/chain-bridge-asic-pdu-selection-inline.webp)

All load limits apply together. The 20 A bank breaker label doesn't replace the bank's approved continuous-load allowance.

## Use the documented continuous allowance once

Mining can keep a circuit loaded continuously. [Schneider distinguishes standard 80%-rated breakers from assemblies approved for 100% continuous loading](https://www.se.com/us/en/faqs/FA104355/?ref=cnainbridge.org) and defines continuous loading here as three hours or more. The applicable equipment and installation conditions matter; a breaker with a larger number on its handle isn't permission to use that full current indefinitely.

For the Eaton example, the published 24 A input figure already includes its agency derating from 30 A. Don't automatically subtract another 20% from that same figure and call the result the manufacturer's rating. Equally, don't turn the 30 A plug label into a 30 A continuous budget. Have the installer document the applicable continuous limit at each level, using the most restrictive requirement for the actual power path.

Keep an operating reserve where the approved design requires it, and include other connected loads. A reduced-power profile needs a defensible maximum input requirement for that configuration; a momentary low dashboard reading isn't a safe purchasing limit. Reassess the schedule before adding a miner or increasing its power target.

I wouldn't calculate a universal number of miners per PDU. Exact PSU inputs, cord requirements, bank assignments and permitted operating modes can make two installations with the same total wattage need different distribution. Ask for the approved allocation, including startup and restoration behavior, rather than dividing advertised watts by a miner's nominal figure.

## Check the complete cord and the exact product evidence

For every connection, match the PDU receptacle, cord-end connectors and PSU inlet. Confirm the cord assembly's permitted voltage, current, temperature, length and retention arrangement for this use. A connector name identifies only part of that decision. Don't assume every C13 or C19 product, adapter or cable carries the same approved load.

Ask the supplier for the exact model and revision, installation manual, ratings label, applicable safety certification and the corresponding certification record where available. [UL describes product certification as testing to applicable standards and separately evaluates systems assembled from products](https://www.ul.com/services/certification?ref=cnainbridge.org). Check that the evidence covers the complete PDU you will receive, rather than a component or a different model. Have the installer confirm its suitability under the site's requirements.

The PDUMH30HV PDF lists UL 62368-1 under product certifications and an operating temperature range of 0–40°C. Those are manufacturer-listed specifications for that model, not approval of every mining installation. Check the actual unit's markings and documentation, then account for rack temperature, mounting, access to disconnects and cord routing. A PDU positioned in hot exhaust still has to remain within its own environmental limits.

For used equipment, request clear label and connector photos, condition and service history, and confirmation that the input cord, protection and internal assembly haven't been modified. Reject damaged or undocumented equipment until the supplier and installer resolve the issue. A low price doesn't compensate for an unidentified power path.

## Pay for the metering and control you need

Choose measurement granularity before comparing the word “smart.” The Eaton example has local current meters for its banks. [Eaton also distinguishes basic, metered-input, metered-outlet and managed PDUs](https://www.eaton.com/us/en-us/products/backup-power-ups-surge-it-power-distribution/power-distribution-for-it-equipment.html?ref=cnainbridge.org). Its managed range adds remote outlet switching. Verify the selected SKU's functions; a local meter doesn't imply network access, per-outlet measurements or remote power cycling.

- **Local metering:** useful when authorized staff can read the unit and record each relevant bank's current.
- **Network monitoring:** useful when you need remote readings and alerts. Confirm whether it measures the input, each phase, banks or individual outlets, and whether it records current, real power or energy.
- **Remote switching:** useful when an authorized operator needs controlled outlet shutdown or restart. Confirm grouping, sequencing and what happens after a power or network interruption.

I'd pay for switching when it removes a defined service visit or supports an approved shutdown procedure. A miner with multiple required power cords needs a coordinated control plan; don't assume its inputs are redundant or independently switchable. An automatic reboot based only on a lost network response could also restart equipment while the underlying fault remains.

Keep the management interface on the site's controlled network, restrict who can switch outlets, replace default credentials and follow the manufacturer's update procedure. Ask how alarms are delivered and acknowledged. Electrical metering shows the distribution load; miner and pool records establish whether the intended machine is doing accepted work.

If you need ambient temperature or humidity alerts, confirm the supported sensor, its location and any additional hardware or license in the quote. A built-in current meter doesn't establish environmental monitoring. Compare the complete installed cost: PDU, approved cords, mounting, electrical work, network hardware, sensors, support and any recurring fees.

Monitoring can reveal an avoidable load or operating problem, but a network socket doesn't establish an efficiency improvement or profit increase. Don't budget a claimed savings percentage without a relevant measurement method and comparable conditions. Also verify any surge protection, automatic shutoff or voltage-conditioning claim separately; the word “PDU” doesn't establish those functions.

## Accept the installation against a written load schedule

Give the electrician or authorized site staff the supply requirements, exact PDU documents, PSU instructions and proposed load schedule before purchase. They should confirm the connection and protection design, grounding, permitted continuous loading, outlet and phase assignments, mounting and local requirements. Mains wiring, receptacle changes and energized inspection belong to the people qualified and authorized to perform them.

After installation, have that team verify the supplied equipment against the approved design and commission it under the manufacturer's procedures. Retain a record of:

1. The PDU identity, supply and upstream protection, plus the approved continuous limits for the input, banks and individual connections.
2. Each miner and PSU, required cords, outlet identifiers, bank or phase assignments and approved operating profile.
3. Observed input and relevant bank or phase loads under the agreed operating conditions, with unresolved alarms or abnormal behavior corrected.
4. Confirmed meter readings, alert delivery, authorized switching groups and startup or power-restoration behavior where those functions are used.
5. The person responsible for reviewing the schedule before equipment, firmware profiles or power targets change.

Stop for damaged connections, burning smells, overheating, unexplained protection trips or a load outside the approved allocation. Follow the site's safe isolation procedure and have qualified staff investigate; don't repeatedly reset a breaker or add adapters to keep the rack running. [Eaton's PDU FAQ uses “daisy-chaining” for sharing a network address](https://www.eaton.com/us/en-us/products/backup-power-ups-surge-it-power-distribution/power-distribution-for-it-equipment/rackmount-pdu-faq.html?ref=cnainbridge.org); that feature doesn't authorize cascading mains power connections.

Keep the accepted schedule beside the equipment records. Start the next purchase or power-profile change with that document, and use the [mining library](https://cnainbridge.org/tag/mining/) to connect the electrical plan with cooling, miner monitoring and operating costs.